Ikona BIP Ikona Portal Pracownika Ikona poczty Facebook Twitter Instagram Youtube Linkedin RSS Ikona szukania PLEN

Coal in 3D

All the coal deposit of Jastrzębska Spółka Węglowa have been mapped onto the virtual 3D space. The Company has just completed the project entitled “Deposit model and production planning at JSW S.A.” aimed at implementing a modern deposit management and production planning system in accordance with the global trends in this respect.

photo: Dawid Lach

Within the framework of the project, a system has been implemented based on two global IT solutions, which made the deposit management and design process in mines much more advanced. Systems of similar type are the basis for the operation of foreign mining concerns in Australia or the United States. In Poland, so far only LW Bogdanka and KGHM mines planned their production based on 3D deposit models. Now they are joined by JSW

A 3D model of deposits is a graphic visualization of its structure and any occurring disturbances, created on the basis of information that we have about the deposit. The 3D model of the deposit was based on the adjustment of the IT infrastructure in mines to the joint efforts of surveying and geological departments and the production preparation departments, as well as the preparation and review of data.

As a result of project work, a central geological database was created in JSW mines, fed with data from 250 surface holes, 1,440 underground holes, 14,670 roadway profiling exercises, more than 24,000 quality samples, 100 main faults and more than 150 faults.

The work on the project produced final effects in the form of spatial structural and quality models of deposits in JSW’s mines and strategic production schedules. The Company has set a schedule for executing 700 kilometers of planned roadway excavations and 480 longwalls, including 50 types of roadway roof supports and 25 algorithms for calculating production limitations. 

Additionally, the visualization and the modern 3D model of the deposits allow for a better understanding of variations in extraction and geological conditions in mines, while the scheduling software supports an even better optimization of production at JSW, among others by offering development of various production scenarios for the mines.

– Reliable information about the size of resources and the quality of coal to be mined is essential for the correct operation of coal mines. The cost optimization process in the operational area may be conducted effectively only if the Company has in-depth knowledge of all of the costs it incurs and is able to react quickly to changes occurring in the production area – emphasized Artur Dyczko, JSW’s Vice-President for Strategy and Development.

Other news

The JSW Management Board has asked the Company’s trade unions to select joint representatives to work out a salary agreement

Jastrzębska Spółka Węglowa S.A. has sent a request to all 82 trade union organizations operating in the Company to select joint trade union representation and to respond to a draft agreement concerning the temporary suspension of selected payroll benefits.

Cooling for the entire mine

Three technological halls, closed-loop water circulation, and an oil-fired boiler room as a backup heat source. These are the features of the air conditioning station which will provide cooling for the Knurów mine workings in the coming months. The performance of the…

Open letter to Representative Trade Union Organizations operating at JSW SA

Dear Sirs/Madams,

On Tuesday, 30 December, another round of talks took place. Unfortunately, it has still not been possible to reach an agreement between the Management Board and the trade unions. We strongly urge you once again to be open to reaching a compromise and…

Talks between the JSW SA Management Board and the trade unions without agreement

(UPTADE) The talks between the JSW SA Management Board and the trade unions concerning the need to temporarily reduce labor costs in the Company ended without reaching an agreement. The JSW SA Management Board remains determined to continue the dialogue and work out…

Rescue operation in KWK Pniówek completed

(UPDATE) After seven hours of rescue efforts, rescue workers reached two missing miners with whom contact had been lost after a methane leak in the N-9 working face at a depth of 830 meters. Unfortunately, the doctor pronounced them dead. Both miners were experienced…

Strategic investment in Pniówek completed

December saw the completion of one of the most important investments in the history of the Pniówek mine. The deepening of Shaft III to a depth of 1,053 meters and the commissioning of the new level 1,000 is a landmark stage in improving safety, transport efficiency and…

More news